Kemper Street Bridge Project
This is a bridge replacement project that also includes interchange modifications. The project will be coordinated with the construction of Phase I of the Midtown Connector.
The structure is deteriorated and the obsolete design is not repairable.
|
|
|
|
|
|
|
|
| Anticipated Construction Timeline | |
|---|---|
| Design Phase | May 2012 through June 2012 |
| Bid | May 2013 through July 2013 |
| Construction | September 2013 through November 2014 |
| Project Close Out | November 2014 through February 2015 |
| City of Lynchburg Representatives | ||
|---|---|---|
| Construction Manager | Charles Grant | 434-455-3934 |
| Project Manager | Joe Smith | 434-455-4449 |
| Consultants |
McCormick-Taylor, HDLA, LID/LEAF |
|
| Design Firm | Mattern & Craig | |
| Contractor | TBD | |
| Current Posted Projects | |
|---|---|
| 2012 Bridge Maintenance Project | Lower Bluff Walk Phases II & III |
| Bridge Safety Inspections | Main St Bridge Rehabilitation |
| Fifth Street Phase II | McConville Road Culvert |
| Jefferson Street South / Lower Bluff Walk Phase I | Rivermont Avenue Bridge |
| Kemper Street Bridge Project | Wards Road Bridge Improvements |
| Lakeside Dr / Park Ave / Memorial Ave Intersection | |