    Kemper Street Bridge Project

     This is a bridge replacement project that also includes interchange modifications. The project will be coordinated with the construction of the Midtown Connector. 

    The structure is deteriorated and the obsolete design is not repairable.

     

     

    Anticipated Construction Timeline
    Design Phase Value Engineering Redesign - April through August 2014
    Bid Anticipated - Late Summer of 2014
    Construction Anticipated - Winter of 2014 through Spring of 2016
    Project Close Out Anticipated - Summer of 2016

      

    City of Lynchburg Representatives
    Construction Manager Cheree Taylor 434-455-4451
    Project Manager Joe Smith 434-455-4449
    Consultants McCormick-Taylor,
    HDLA, LID/LEAF, MBP
     
    Design Firm Mattern & Craig  
    Contractor TBD  

     

    Current Posted Projects
    2012 Bridge Maintenance Project Lower Bluff Walk Phases II & III
    Bridge Safety Inspections Main St Bridge Rehabilitation
    Fifth Street Phase II McConville Road Culvert
    Jefferson Street South / Lower Bluff Walk Phase I Rivermont Avenue Bridge
    Kemper Street Bridge Project Wards Road Bridge Improvements
    Lakeside Dr / Park Ave / Memorial Ave Intersection  

     

     

    No votes yet