    Lower Bluffwalk Phase 2

    The Lower Bluffwalk Phase 2, project is a proposed pedestrian street located between the buildings that face Jefferson and Commerce Streets.  The walkway will create opportunities for an entirely new environment for the existing and proposed buildings along its path.  It is envisioned to be a spine for a new, mixed use cultural district with new galleries, shops, cafes, courtyards and overlooks.
     
    The goal is to build the balance of the bluffwalk in this project to the extent possible with available funding, focusing on supporting the current momentum of private development and creating links to active public places that provide routes to the riverfront area.
     
     
    City of Lynchburg Representatives
    Principle Designer(s) Nelson, Byrd, Woltz Landscape Architects 434-984-1358
      Kennon Williams Landscape Architects 434-989-4456
    Secondary Designer(s) Greening Urban 804-217-7436
      DMPWV Structural Engineers 434-295-5171
      Wiley-Wilson 434-947-1601
      Masters Engineers and Designers, Inc. 434-846-1350
      Gilmore Lighting Design 301-907-7575
      Hydro Dramatics 314-231-9806
    Construction Manager Charles Grant 434-455-3934
    Project Manager Cheree Taylor 434-455-4451
    Construction Inspector Derick Custis 434-455-4253
    General Contractor Coleman-Adams Construction, Inc. 434-525-4700

     

     

    Current Posted Projects
    2012 Bridge Maintenance Project Lower Bluff Walk Phases II & III
    Bridge Safety Inspections Main Street Bridge Rehabilitation
    Fifth Street Phase II McConville Road Culvert
    Jefferson Street South / Lower Bluff Walk Phase I Rivermont Avenue Bridge
    Kemper Street Bridge Wards Road Bridge Improvements
    Lakeside Dr. / Park Ave. / Memorial Ave. Intersection  

     

     

     

     

     

    "Working Together to Serve You Better!"

    No votes yet