I only have a small concern for Wiggington Road. I don't think it was built for a lot of traffic. Can you address my concerns?

The current left turn count shows 8 vehicles in the morning and 12 vehicles in the PM peak hours making that turn. Our projections for the year 2045 show 10 vehicles in the AM and 15 vehicles in the PM peak hours. Under the new configuration, those projected left turns will have to re-route as discussed in the public meeting. If all of the vehicles choose to use Wiggington, a maximum of 15 vehicles as currently anticipated, would equate to one vehicle every 4 minutes. However, if the Wiggington/Old Forest Road intersection becomes more congested in the future, motorists could choose to use the "circular" route as described in the public meeting.

Show All Answers

1. How will traffic approaching Lakeside Dr & Old Forest Rd coming from Forrest be re-routed? How will the changes alleviate that traffic?
2. I only have a small concern for Wiggington Road. I don't think it was built for a lot of traffic. Can you address my concerns?
3. If we plan to spend this kind of money, would it be possible to consider putting in protected bike lanes and sidewalks?
4. When considering crossing points for pedestrians would it be possible to consider either a bridge or a tunnel so that pedestrians and cyclists are protected and reduce the amount of slow downs?
5. Is there any possibility that the engineers reviewing this design could consider testing traffic circles in the 3 major intersections?
6. What is the proposed with of the SE section of Whitehall Rd?
7. Is the turn lane/lane of travel onto the SE section of Whitehall Road from the connector road engineered to safely accommodate a tractor trailer and straight trucks?
8. Can you please correct the ownership shown on the public hearing documents for this parcel?
9. How will this property access the new road way (127 Whitehall Road)?
10. How will a vehicular drive way and an emergency vehicle access be maintained during construction and after project completion (127 Whitehall Road)?
11. How will this property access the new road way (109 Whitehall Road)?
12. Can you please provide details and plan sections showing the proposed SWM pond that adjoins this parcel (109 Whitehall Road)?
13. How will this property access the new road way (109B Whitehall Road)?
14. How will a vehicular drive way and an emergency vehicle access be maintained during construction and after project completion (109B Whitehall Road)?
15. Can you please indicate the access point on the new road way that will serve this parcel (115 Whitehall Road)?
16. Can you please correct the ownership on the public hearing documents for this parcel (115 Whitehall Road)?
17. Can you please provide plan section showing the sidewalk and shared use path that will be located in front of this parcel (115 Whitehall Road)?
18. Has a site plan for the commercial development of this parcel has been submitted to the city (115 Whitehall Road)?
19. How will the on-grade entrance on the NE side of the NB one- way pair be made available for use by adjoining private property owners?
20. How will this project enhance the vitality of the adjoining lands and uses on the NB road section of this one-way pair?
21. Can you please explain the concept of complete streets and how it will apply to this project?
22. Can you please provide information showing planned locations of utilities such as water lines, sanitary sewer and electric power, in the vicinity of, and along, the NB lanes of the one-way pair?